Manufacturing Technology, Digital Transformation

State of the Market: The Critical Path to Digital Manufacturing

August 8, 2022

State of the Market: The Critical Path to Digital Manufacturing
Similar to a perfect storm, manufacturers have been navigating a unique time of multiple challenges including supply-chain disruptions, economic uncertainties, and worker shortages. Digital transformation is supposed to ease these strains. Digitizing processes and adopting the right technologies can help achieve cost efficiencies, allow for scalability and growth, and overcome talent gaps

Spotlight

Advanced Electronics Company

Advanced Electronics Company, was established in 1988 under the directives of the Government of Saudi Arabia. AEC is an offset program company and now a recognized leader in the field of modern electronics and ICT manufacturing, systems integration, repair, operation and maintenance services. AEC is a private sector company to serve local, national, regional and international clients within the defense, telecom and manufacturing industries. The AEC charter includes design, development, manufacturing, the provision of upgrades and logistical support of electronic products & systems.

OTHER WHITEPAPERS
news image

Digital Transformation and Its Impact on Quality Assurance

whitePaper | August 17, 2022

The conversion brought forth by digital transformation and advanced technologies has made a tremendous impact on the way manufacturers process and manage their organizations. While the strategies of agile and modern management systems, specifically quality management, are the result of digital conversion, there is still limited understanding and unclear identification in this new era of quality assurance impact. With the development of digital methodologies, the classical system of operating businesses has been disrupted. As a result, many organizations are in the process of reacting to digitization by utilizing enhanced business platforms and rebuilding the waterfall approach to the agile approach

Read More
news image

THE INTELLIGENT ENTERPRISE FOR PAPER AND PACKAGING COMPANIES

whitePaper | June 2, 2022

For decades, energy-intensive commodity businesses for paper and packaging aimed for better process control, leading to higher product quality with less energy consumption. This would help to both reduce costs and maintain a healthier environment. A plethora of concepts and devices were invented to control the production and verify or predict the product quality. This approach had some measure of success, but it had its limits.

Read More
news image

Device Manufacturing and Provisioning with X.509 Certificates in AWS IoT Core

whitePaper | November 17, 2022

Amazon's trademarks and trade dress may not be used in connection with any product or service that is not Amazon's, in any manner that is likely to cause confusion among customers, or in any manner that disparages or discredits Amazon. All other trademarks not owned by Amazon are the property of their respective owners, who may or may not be affiliated with, connected to, or sponsored by Amazon.

Read More
news image

Unleashing the potential growth with Data-driven Manufacturing

whitePaper | December 30, 2022

In recent years, Data and analytics capabilities have made a good progress resulting to numerous recent advancements. Majority of advancements have been made in various ways like development of more sophisticated algorithms, exponential growth in the volume of available data, and storage and computational power have uninterruptedly improved. The combination of these trends has led to business disruptions and fueling rapid technology advances.

Read More
news image

Design for Manufacturing and Test

whitePaper | November 11, 2022

A common ‘Design for Excellence’ approach in any product design process is the ‘Design for Manufacturing’ which is simply to ensure the products are easier to be manufactured. A significant and important part of this approach is the ‘Design for Manufacturing Test’ concept. A final product that was manufactured but is difficult to test to effectively measure its quality and reliability before shipping out may result in disastrous consequences when these products fail out in the field, especially when the products are used in mission-critical industries such as the automotive industry.

Read More
news image

The Best of Both Worlds: Combining AM and IM to Master the Whole Life Cycle of Your Parts

whitePaper | January 2, 2023

Additive Manufacturing (AM) and Injection Molding (IM) are often perceived as competing plastic processing technologies. However, organizations must be ready to utilize and switch between different production technologies to address changing product requirements, shift production schedules based on market demands, or respond to supply chain crises. This includes making both technologies complementary, not exclusive.

Read More

Spotlight

Advanced Electronics Company

Advanced Electronics Company, was established in 1988 under the directives of the Government of Saudi Arabia. AEC is an offset program company and now a recognized leader in the field of modern electronics and ICT manufacturing, systems integration, repair, operation and maintenance services. AEC is a private sector company to serve local, national, regional and international clients within the defense, telecom and manufacturing industries. The AEC charter includes design, development, manufacturing, the provision of upgrades and logistical support of electronic products & systems.

Events